Our location
Our premises were built in 2012-2013 in Wolfertschwenden, directly next to the A7 freeway. On a 20,000 sqm site we have built a 4,500 sqm modern office and manufacturing complex.
Our premises were built in 2012-2013 in Wolfertschwenden, directly next to the A7 freeway. On a 20,000 sqm site we have built a 4,500 sqm modern office and manufacturing complex.
Our premises were built in 2012-2013 in Wolfertschwenden, directly next to the A7 freeway. On a 20,000 sqm site we have built a 4,500 sqm modern office and manufacturing complex.
The center of our production facility is a bright assembly hall flooded with light.
A perfectly equipped test and demonstration room allows us to demonstrate slicing systems under operating conditions that are as realistic as possible. Slicers are always available in order to convince our customers of our performance capabilities. The room is air-conditioned, allowing slicing at low temperatures even in summer. A total of 11 individually adjustable cooling chambers guarantee the best possible product preparation. A hygienic floor with water outlets and drainage allows wet cleaning of the demonstration system and execution of hygiene and cleaning training courses.